Condo Interior Design in Singapore: From Vacant Possession to Move-In

Condo interior design in Singapore starts earlier than most owners expect. The moment the developer issues vacant possession, a defects liability period starts running, and what you record in the first weeks decides what the developer fixes at its own cost. This guide follows a new condo owner from vacant possession to move-in, covers the rules that govern a private unit, and flags the Housing Developers Rules changes that take effect on 31 December 2026.
Your clock starts at vacant possession
The defects liability period (DLP) is the window in which owners report defects from poor workmanship or faulty materials. The developer resolves them under your Sale and Purchase Agreement (S&PA), and the agreement sets out which defects it covers. For an individual unit, the DLP is 12 months. After it ends, you take responsibility for the unit's upkeep and may need to engage your own contractor.
From 31 December 2026, new rules apply to projects launched for sale on or after that date. The DLP and your maintenance charge liability start together, on the earlier of the 35th day after receipt of the Temporary Occupation Permit payment notice and the actual date of vacant possession. The DLP for common property extends to 12 months from that start date, or six months after the first AGM, whichever is later. Check the start date written in your own S&PA.
Inspect before you renovate
Once renovation starts, it becomes harder to say whether a crack or a leak came with the unit or arrived with the works. Walk the unit before any contractor enters and record what you find.
- Take dated photos of every room.
- Test doors, windows, taps, showers, drains, power points and switches.
- Look at ceilings, walls and floors for cracks, stains and hollow-sounding tiles.
- Report defects to the developer in writing and keep the dates.
Our BTO key collection checklist lists the items to test, and the same walk-through applies in a condo unit. Defects in a condo go to the developer, since HDB's defects process covers HDB flats.
Condo interior design in Singapore: know who approves what
HDB's permit system covers HDB flats. For private residential property, BCA does not regulate general renovation works, so the rules that matter come from your S&PA, your developer and your MCST. BCA advises owners to check these before starting any work. In practice, ask your management office about approvals, deposits, working hours and rules for contractors, and ask which documents it needs and how long approval takes.
- Structural elements. Slabs, beams, columns and walls cannot be altered without a Professional Engineer's assessment and the approval of the Commissioner of Building Control.
- External features. Changes to windows and walls fixed on the external building need MCST approval and any relevant government agencies' approval.
- Appearance changes. Additions that change how the building looks, such as awnings or coverings on a private enclosed space, need the MCST's permission.
- Floor area. Work that increases the estate's total gross floor area needs a 90% resolution from the MCST.
Our guide to resale HDB versus condo renovation rules compares the two systems in more detail.
Use the new floor plan detail
For projects launched on or after 31 December 2026, floor plans must show air-conditioning condenser locations and numbers, and developers must build units to the scaled floor plans given to buyers before the booking fee is collected. That detail helps you plan ceiling heights, cove lighting and furniture around the condenser positions from day one. For earlier launches, check your plan with your designer and measure on site.
The order of work in a new condo
- Inspect the unit and report defects in writing.
- Read your S&PA and your management's renovation rules.
- Brief your designer and get dimensioned drawings.
- Ask two or three firms to quote from the same drawings.
- Sign a written contract, then secure management approval and pay any deposit.
- Carry out works in a workable order, with inspections along the way.
- Inspect, correct defects and make the final payment, then move in.
The BTO renovation timeline sets out this logic in nine stages. Its HDB-specific rules do not apply to a private unit, and its ordering advice does. For typical durations, see how long a renovation really takes.
Quote lines specific to condos
When you compare quotes, check that each one states protection of floors, lifts and common areas, daily and final cleaning, permit application and any fees, and condo management deposits. Ask who supervises the site day to day.
If you are choosing a condo interior designer, our condo page shows how we work within MCST rules, the condo homes we have completed and what clients say.
Renovating a condo?
See the condo homes we have designed, how we work within your MCST’s by-laws, and what our clients say.
4.9 on Google ReviewsCaseTrust certifiedFree first consultation
Free guide from Ace’s Design
12 Line Items to Check in Any Renovation Quote
The 12 line items, six checks to settle before you sign, and a worksheet for setting Quote A, B and C side by side.
Leave your details and we will email you the PDF.