HDB Toilet Renovation: Rules, Order of Works and What You Can Change

A toilet is the smallest room in an HDB flat and one of the most tightly regulated to renovate, because a leak does not stay in your flat. It goes into the ceiling of the one below. That is why HDB sets out in detail what you can overlay, what you can replace and when, and what must be done by a licensed plumber. This guide covers those rules and the order the work is done in. For layout and design ideas, see our BTO toilet design guide.
Overlay or Hack? The Two Ways to Renovate a Toilet
Feature | Overlay | Hack and replace |
|---|---|---|
What happens | New tiles laid over the existing ones with adhesive | Old tiles and screed removed, new waterproofing, new tiles |
HDB permit | Not required | Required |
New BTO flat | Allowed during the first 3 years | Only after 3 years from block completion |
Thickness limit | Finishes with adhesive no more than 13mm | Finishes and screed no more than 50mm (floor) |
Waterproofing | Existing membrane left in place | New pre-packed waterproofing screed and membrane |
Noise and time | Less | More; hacking is noisy work |
Overlaying tiles
HDB allows new floor finishes to be laid over existing ones using adhesive only, without a permit, on conditions: there must be only one layer of existing finishes, including the cement screed, the new finish including adhesive must not exceed 13mm, the floor trap must not be tampered with, and the work must not cause backflow or seepage into the bedroom. Walls follow a similar rule: overlay with adhesive is allowed up to 13mm, with no third layer of wall finishes.
Hacking and replacing
Replacing the floor or wall tiles needs an HDB permit. For the floor, the total thickness of finishes and screed must not exceed 50mm, pre-packed waterproofing screed and a waterproofing membrane must be laid first, and the membrane must be turned up at least 150mm against the walls, kerbs and pipes. HDB also requires a UPVC floor trap grating with a long collar. For the walls, the finishes including plaster must not exceed 25mm.
The 3-Year Rule for New Flats
In a new flat, HDB does not allow the bathroom and toilet floor and wall finishes to be replaced for the first three years from the completion date of the block, to protect the waterproofing. Overlaying is the way to change the look in that period. After three years, replacement is allowed with a permit and the waterproofing above. If you are deciding how much to do in a new flat, our guide to the 4-room BTO renovation package compares a package with a bespoke renovation.

Minimalist Japandi, at 274B Punggol Place
Shower Screens, Trays and Bathtubs
A shower screen is the most effective change in a small HDB toilet, because it keeps the rest of the floor dry. HDB allows one to be installed provided the floor slab is not tampered with. Fixed panels, sliding doors and swing doors all work, and the choice depends on where the toilet bowl, basin and door sit.
- Shower trays. The void beneath a shower tray must not be filled with cement mortar or other material, and weep holes must be provided.
- Bathtubs. Extending the toilet to fit a long bath is not allowed. The void under the bath must be kept, with an inspection opening for maintenance and weep holes.
- A kerb. A cement mortar kerb up to 100mm high and 100mm wide can be built without a permit, to hold back shower water.
Toilet Bowls, Basins and Pipes
- Licensed plumbers. HDB requires water service and sanitary works to be done by a PUB Licensed Plumber, including installing, replacing or removing a toilet bowl and sealing the discharge pipe.
- Squat to pedestal. Replacing a squat pan with a pedestal pan is allowed, but holes cannot be hacked in the floor slab and vent pipes must not be removed.
- Basins. A basin can be repositioned, provided the floor slab is not tampered with.
- Concealed pipes. Pipes can be concealed in the floor finishes or the wall, but the slab and wall must not be tampered with. HDB discourages this, because a poor job can leak into the flat below.
- No-drill zones. Flats with concealed water pipes from HDB have no-drill zones. Check the layout plan before fixing a mirror cabinet or shelves.
Bigger Changes
After the first three years, HDB allows a bathroom or toilet to be enlarged with a permit, by no more than 600mm in width and 0.6 square metres in area, and only as a dry area, for example for a basin or shelves. The gas riser and its branch pipe must not end up enclosed in the extension. Replacing the toilet vent also needs a permit, with wire-glass louvres at least 6mm thick and a safety cleat on every louvre.

Modern Minimalist Warmth, at 665B Tampines
The Order of Works
- Permit approved (for hacking and replacement).
- Hacking of old tiles and screed, during HDB’s weekday noisy-work hours.
- Plumbing and electrical rough-in by licensed workers.
- Waterproofing screed and membrane, turned up against walls, kerbs and pipes.
- A ponding test to confirm the waterproofing holds.
- Floor and wall tiling.
- False ceiling, if any, and lighting.
- Fittings: toilet bowl, basin and vanity, shower screen, accessories.
How the toilet fits into the sequence for the whole flat is set out in our HDB renovation process guide, and the permit rules in the HDB permit guide.
Getting Quotes for a Toilet Renovation
Toilet quotes are hard to compare because they bundle trades. Make sure each one says whether it is an overlay or a hack and replace, names the tile and its size, includes the waterproofing and ponding test, lists the fittings by brand and model, and says who supplies the shower screen. How to read a renovation quotation goes through the rest. For finish and layout ideas, our HDB bathroom design guide shows what fits in a 3 square metre room.
If you are planning a toilet renovation, book a free consultation and tell us the age of your flat. It decides what is possible.
Renovating an HDB flat?
See the HDB homes we have designed, how we work within HDB’s rules, and what our clients say.
4.9 on Google ReviewsCaseTrust certifiedFree first consultation
Free guide from Ace’s Design
12 Line Items to Check in Any Renovation Quote
The 12 line items, six checks to settle before you sign, and a worksheet for setting Quote A, B and C side by side.
Leave your details and we will email you the PDF.