BTO Key Collection Checklist: What to Inspect Before You Renovate

Your BTO key collection checklist starts with one rule of order: inspect the flat, report what you find, and start renovating after that. Key collection is a milestone you have waited years for, and it is also the point where a one-year defects liability period begins. What you record in the first days shapes what HDB fixes at no cost to you and what you are asked to pay for later.
What to bring on key collection day
- A torch, a measuring tape and a phone for dated photos
- Painter's tape to mark each defect you find
- A phone charger or plug tester for the power points
- Your floor plan and a notebook, or any defects form HDB provides
- A pen, so that every item is recorded on the day
Take dated photos as you go. Photos and notes give you records to rely on if a defect is disputed later.
BTO key collection checklist: the walk-through
Go room by room and test everything that moves, runs, switches on or drains.
- Doors, windows and gates. Open and close each one, and check that locks and latches work.
- Taps, showers and drains. Run every tap and shower, look under sinks, and check that floor traps drain properly.
- Power points and switches. Test each point and each light switch.
- Ceilings, walls and floors. Look for cracks, stains, hollow-sounding tiles and uneven surfaces. Tap tiles gently and listen for a hollow sound.
- Fittings and finishes. Check paint, tile edges, sealants and anything installed at handover.
How to report defects to HDB
HDB covers newly completed flats with a 1-year Defects Liability Period. During it, you can submit a rectification request online or at the Building Service Centre in your precinct. At the centre, you can choose a date for a joint inspection with HDB's contractor to verify what you reported.
Report as early as you can. Your handover documents may state a target date for your first defects list, so read them on the day. After the one-year period ends, you can engage a repair contractor, and your HDB Branch can help if you need further assistance.
Why defects come before renovation
Once renovation starts, it becomes harder to say whether a crack, a leak or a hollow tile came with the flat or arrived with the works. A clear record made before any work begins keeps that question simple. Starting renovation before reporting defects is one of the five ordering mistakes in our BTO renovation timeline.
How to record defects so they are easy to fix
- Photograph each defect twice, once wide to show where it is and once close to show what it is.
- Mark the spot with painter's tape and number it, so the photo, the list and the wall all match.
- Write the room, the item and a short description on your list, in the same order as your walk-through.
- Keep a copy of everything you submit, with the date.
These records also help when you brief a designer, because they show the true condition of the flat.
What the defects period covers
HDB's defects liability period covers defects in the flat as delivered. Defects in your renovation works fall under your contractor's warranty and your contract, so keep that paperwork as well. If you later want to replace bathroom tiles, check whether the 3-year restriction has ended and whether a permit is needed.
Measure while the flat is empty
An empty flat is the easiest time to measure. Record each room wall to wall, the ceiling height, and the position of doors, windows and columns. HDB states that you can use the floor plan from your Sales Brochure or buy a copy from HDB, and your designer can compare your measurements with it. The numbers catch differences that a floor plan can hide, and they give carpenters and tilers something firm to build from.
Rules to read before you plan the design
Key collection is also the right moment to read HDB's renovation rules, because they shape the design brief.
- Bathrooms and toilets. Newly built flats have a 3-year restriction on removing wall and floor finishes, counted from the date the block was completed. You can overlay existing tiles in the meantime, and a permit is needed to replace finishes after the restriction ends. Ask HDB how the period applies to your block.
- Contractors. Renovation work needs a contractor listed in HDB's Directory of Renovation Contractors, and your contractor applies for the permit.
- Timing. After HDB approves the application, renovation in a new flat should finish within 3 months.
- Household shelter. Its walls must not be hacked or drilled.
SCDF does allow some finishing work inside the shelter. What SCDF allows in a household shelter sets out the flooring, painting and drilling limits.
Our guide to HDB renovation permits and guidelines for 2026 lists which works need a permit.
What comes after the inspection
With defects reported, the sequence runs in order: write a short brief, get dimensioned drawings, ask two or three firms to quote from the same drawings, sign a written contract, wait for the permit, and then begin works. Each step depends on the one before it. Our article on how long a project takes covers typical durations, and the timeline guide gives you a worksheet for your own dates.
Still waiting for your flat? Our upcoming BTO launches guide and BTO renovation cost guide help you plan ahead.
Renovating an HDB flat?
See the HDB homes we have designed, how we work within HDB’s rules, and what our clients say.
4.9 on Google ReviewsCaseTrust certifiedFree first consultation
Free guide from Ace’s Design
BTO Key Collection to Move-In
The nine stages from key collection to move-in, who is involved at each, and a timeline worksheet to fill in with your own dates.
Leave your details and we will email you the PDF.