Hiring an HDB Interior Designer: What They Handle and What Stays With You

Renovation Guides
Living room with a cream bouclé sofa on a timber base and curved plaster walls

An HDB interior designer takes on much of the work of turning a flat into a home: layout, drawings, materials, quotes and coordination. HDB's renovation rules still place certain responsibilities on you as the owner, whoever you hire. Knowing where that line sits helps you ask better questions, read a contract with confidence and avoid surprises at the permit stage. This article sets out what a designer typically handles, what stays with you, and the questions to put to any firm.

What an HDB interior designer typically handles

  • A brief and concept that reflect how you live
  • Space planning that works within HDB's rules
  • Dimensioned drawings and a materials and finishes schedule
  • Quotes and coordination of contractors and trades
  • Permit submission through the contractor
  • Site supervision and milestone checks
  • Handover and follow-up on defects

Scope varies by firm and by contract, so confirm what yours includes in writing. Our guides to what an interior designer actually does and to designer versus contractor explain how the roles differ.

What the rules keep with you as the owner

Under the Housing and Development (Renovation Control) Rules, you must engage a contractor listed in HDB's Directory of Renovation Contractors for renovation work. Your contractor submits the permit application, and you authorise them to do so. HDB sends you an SMS when it receives the application.

You remain responsible for making sure the work follows HDB guidelines. HDB is not a party to your contract with the contractor, and you may face prosecution for engaging an unlisted contractor or for breaching the rules, for example through unauthorised hacking. A good designer reduces that risk by planning within the rules. The responsibility itself stays with the flat owner.

Structural walls, beams, columns and floor slabs must not be hacked, and household shelters are restricted. A designer can plan around these. You can still ask for a written list of every wall your plan changes, with confirmation of how each one is allowed.

Licensed trades behind the scenes

Work

Who must do it

Electrical work

An EMA-licensed electrical worker

Water and sanitary plumbing

A PUB-licensed plumber (since 1 April 2018, apart from simple works)

Air-conditioner installation

A BCA-trained air-conditioner installer

Window installation or replacement

A BCA-approved window contractor listed in HDB's directory

What happens at the permit stage

Your contractor submits an electronic renovation application to HDB, with the floor plan showing the proposed work. HDB states that some renovations need extra steps, such as an HDB evaluation for works like wall demolition, approval from SCDF in some cases, and a Qualified Person to certify or supervise certain works. You can view the permit through HDB's e-service. Start permit-required works only after it is granted, and display the Notice of Renovation outside your flat until works are complete.

Six questions to ask any HDB designer

Question

Why it matters

Is the contractor listed in HDB's Directory of Renovation Contractors?

The Renovation Control Rules require it for renovation work. If the design firm subcontracts the works, ask which listed contractor will carry them out.

Who applies for the permit, and can I see it before permit-required works start?

Works that need a permit must wait for it.

Who carries out each licensed trade, and how can I verify their licences?

Electrical, plumbing and air-conditioning each have a licensing requirement.

Which drawings will the contractor build from, and who prepared them?

A picture has no measurements, and quotes need drawings to be comparable.

How are changes priced and approved?

Changes in writing protect your budget and schedule.

What is the defects period, and who returns to fix problems?

It decides who pays when the result differs from the plan.

Ask every firm you meet, Ace's Design included. The answers are easy to compare when they are written down, and our Renovation Quote Checklist shows how to line them up beside each quote.

What you can handle yourself

If your plan is cosmetic only, such as painting, changing light fittings and buying furniture, you may not need a designer at all. A designer earns their fee when a plan changes walls, bathrooms or kitchens, electrical or plumbing points, built-in carpentry or flooring, since each of those brings rules, trades and drawings into play.

If you own a condo, HDB's contractor list and permit system do not apply. Ask your management office about approvals, deposits, working hours and rules for contractors.

Paperwork to hold before works start

  • A signed contract stating the scope, drawings, schedule and payment stages
  • The renovation permit, which you can view through HDB's e-service
  • The names and licence details of the licensed trades
  • Warranties for waterproofing, joinery and electrical work

Our guides to what should be in your renovation contract and HDB renovation permits cover the details.

Renovating an HDB flat?

See the HDB homes we have designed, how we work within HDB’s rules, and what our clients say.

4.9 on Google ReviewsCaseTrust certifiedFree first consultation

Free guide from Ace’s Design

The AI Render Reality Check

Nine questions to ask before you build what the picture shows, with a checklist you can mark Answered, Not sure or Problem.

Leave your details and we will email you the PDF.