Newer HDB flats come with a household shelter, often called the bomb shelter, and SCDF’s shelter requirements apply to private houses and flats too. In everyday life it becomes a store room, a walk-in wardrobe or a small study, and owners naturally want it to look like the rest of the home. It is also the one room that cannot be renovated like the others. This guide sets out what the Singapore Civil Defence Force (SCDF) allows and does not allow, and how to design the room within those rules.
What Is a Household Shelter?
HDB describes the household shelter in an HDB flat as designed to serve as a civil defence shelter, fitted with a steel door and with strengthened floor, walls and ceiling to protect occupants in a wartime emergency. SCDF adds that certain finishes and fixtures are not permitted because they are not easily removable and could become hazards to the people sheltering inside.
The rules below come from SCDF’s list of permitted and not permitted works for household shelters, which is part of its Technical Requirements for Household Shelters. They apply to houses and flats generally, not only to HDB flats. SCDF’s overarching rule is that any repair, alteration or renovation likely to weaken or damage any structural element of the shelter is not permitted.
What SCDF Allows
- Floor tiles on wet cement mortar. The total thickness of floor finishes and screed must not exceed 50mm.
- Skirting tiles up to 100mm high, bonded to the walls with wet cement mortar.
- Vinyl or linoleum flooring.
- Painting the walls, ceiling and door. The door notice, locking bolts and door seal must not be covered or painted over. Old paint on the door and frame should be removed before repainting, and new paint must be completely dry before the door is closed, or the door and rubber gasket can stick to the frame.
- Drilling the inside walls and ceiling to a depth of no more than 50mm, to fix inserts and removable screws. Non-metallic inserts of any diameter can be used if they are adequate for the purpose.
- Power-driven nails on the outside face only of the shelter walls, no more than 75mm long.
- Splatter dash on the outside face of the shelter walls, as a rough surface for feature wall panels or wall tiles.
- Covering the ventilation openings with removable finishes, provided at least 25% of the total area of the two openings is left uncovered for ventilation in peacetime.
What SCDF Does Not Allow
- Wall tiles, rock tone spray, cement sand finish or gypsum plaster on the inside walls.
- Floor tiles laid with adhesive, or a second layer of tiles on the floor or skirting.
- Cornices inside the shelter.
- Power-driven nails into the inside walls.
- Hacking or drilling the walls, floor or ceiling beyond the drilling allowed above.
- Hacking either face of the walls to key tiles, or the outside face to mount feature panels or tiles.
- Covering, removing or tampering with the door notice.
- Modifying, changing, removing or tampering with the door and its frame.
- Altering any part of the ventilation openings, plates, bolts and nuts.
- Painting the inside face of the steel plate on the ventilation sleeves, the sleeves, the rubber “O” ring gaskets or the bolts that hold the plate.
At a Glance
Work | Allowed? | Condition |
|---|---|---|
Vinyl or linoleum flooring | Yes | — |
Floor tiles | Yes | On wet cement mortar; finishes and screed 50mm at most |
Floor tiles with adhesive | No | — |
Wall tiles inside | No | — |
Painting walls, ceiling, door | Yes | Not over the door notice, bolts or seal |
Shelves and cabinets on the inside walls | Yes | Removable screws, drilled 50mm deep at most |
Power-driven nails | Outside face only | 75mm long at most |
Feature panels or tiles on the outside face | Yes | On splatter dash, without hacking |
Covering the vents | Partly | Removable, with 25% of the openings left clear |
Changing the door | No | — |

Minimalist Zen, at 781 Pasir Ris
Designing the Shelter Within the Rules
Shelving and storage
Shelves and cabinets on the inside walls are allowed when fixed with removable screws into non-metallic inserts, but SCDF requires owners to remove fixtures such as pictures, posters, cabinets and shelves from the inside walls within 48 hours of being notified. Freestanding shelving, or carpentry that stands on the floor and is held with removable screws, makes that easy. Avoid anything built so that it cannot come out quickly.
A walk-in wardrobe or store room
With freestanding wardrobe systems, open rails and a vinyl floor, the shelter makes a practical dressing room or store. Keep the door clear, so it can always open and close fully, and do not block the ventilation openings with cabinets. For other ways to fit a dressing area into a flat, see our walk-in wardrobe guide.
Making the outside match the room
The outside face of the shelter often forms part of the living room or a bedroom. SCDF allows splatter dash on that face so feature panels or wall tiles can be fixed, and power-driven nails up to 75mm, but no hacking. That means the wall can carry the same panelling or tiles as the rest of the room, as long as nothing is hacked into it. The door itself can be painted to blend in, as long as the notice, bolts and seal are left clear.
False ceilings outside the shelter
If you build a false ceiling outside the shelter below the ventilation sleeves, SCDF requires a perforated access panel of at least 600mm by 600mm directly below each sleeve. Plan it with the ceiling design rather than discovering it during installation. Our HDB ceiling height guide covers false ceilings more generally.
What SCDF’s List Does Not Cover
SCDF’s list does not mention everything owners ask about, such as adding air-conditioning or new power points. Where a job is not on the list, treat the general rule as the guide: nothing that weakens or damages the structure, and no hacking or drilling beyond what is allowed. Ask your contractor to confirm with SCDF before work starts.
Before You Start
In a new flat, check the shelter at key collection: the door should open and close smoothly and the rubber gasket should be in place. Our BTO key collection checklist covers what to inspect, and the HDB renovation permit guide covers the rest of the flat. Make sure your contractor and carpenter know the shelter rules before they quote, so the design does not include anything that would have to be removed.
If you would like help planning the shelter as part of your renovation, book a free consultation.
Planning a renovation?
See the homes we have designed, how we work, and what our clients say, for your type of home.
4.9 on Google ReviewsCaseTrust certifiedFree first consultation
Free guide from Ace’s Design
BTO Key Collection to Move-In
The nine stages from key collection to move-in, who is involved at each, and a timeline worksheet to fill in with your own dates.
Leave your details and we will email you the PDF.